Digi SYNC/570i Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Vernetzung Digi SYNC/570i herunter. Digi SYNC/570i User`s manual [en] Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 54
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
Digi International, Inc.
11001 Bren Road E.
Minnetonka, MN 55343
(612) 912-3444
Digi International GmbH
Domkloster 1
50667 Köln
Germany
+49 221 920-520
USER’S MANUAL
SYNC/570i-56
Synchronous Switched 56K - Leased Line
CSU/DSU Expansion Board
90000005A
Seitenansicht 0
1 2 3 4 5 6 ... 53 54

Inhaltsverzeichnis

Seite 1 - SYNC/570i-56

Digi International, Inc.11001 Bren Road E.Minnetonka, MN 55343(612) 912-3444Digi International GmbHDomkloster 150667 KölnGermany+49 221 920-520USER’S

Seite 3

The Digi SYNC/570i-56 is a high-performance expansion board for ISA or Micro Channel computers. This two port cardincludes an integrated CSU/ DSU func

Seite 4 - Declaration of Conformity

24mA @ -12 VDC ± 5%Operating Temperature: 10-55° CRelative Humidity: 5-90%, noncondensingAltitude: 0 to 12,000 feetCompliance: AT&T Technical Publ

Seite 5 - With FCC Standards

After opening the shipping box, check the contents.WARNINGLeave the board in its protective anti-static bag until installation. When installing or rem

Seite 7

Step 1. Set Up the Main BoardBefore installing the SYNC/570i-56 in an ISA system, you must set the I/O address.NOTEIf you are installing the SYNC/570

Seite 8

Commonly Used I/O Address SYNC/570i-56 Switch Settings

Seite 11

Step 2. Set Up DaughterboardThere are two configuration options that you must set properly on the daughterboard: • Interface port set via two bl

Seite 12

Digi International is a registered trademark of Digi International Inc. The Digi logo is a trademark of Digi International Inc. All otherbrand and pro

Seite 13

b. Pull the daughterboard from the motherboard. (There is one connector holding the daughterboard. Do not use atwisting motion.)c. Install the jumper

Seite 14

CSU/DSU Powerup ConfigurationThe DIP switch, that configures the initial powerup of the CSU/DSU, can be changed with the daughterboard connected tothe

Seite 15

Step 3. Install In ComputerWARNINGTurn off power to your computer and disconnect the power cord. Inserting a board into the system with power applied

Seite 16

Step 4. Configure the Micro Channel SYNC/570i-56NOTESkip this step if you have an ISA card.Configure the SYNC/570i-56 through your computer’s Micro Ch

Seite 17

Step 5. Other ISA Card Set-up OptionsThe memory address and interrupt line (IRQ) are software configurable via either your operating system or an inst

Seite 19

The diagnostics diskette in conjunction with the loopback connector is designed to verify correct installation. Make a copyof this disk and store the

Seite 20 - Each jumper set on the

The diagnostics program also tests the ability of the card to generate interrupts by way of internal data loopbacks. Ittests all found ports. For exam

Seite 22

If the diagnostics are successful, connect the appropriate interface cables. The SYNC/570i-56 provides two ports: • Switched 56K/DDS Telco interfa

Seite 23

A Note Concerning Radio and Telephone Network InterferenceFCC Part 15 RequirementsThe ISA SYNC/570i-56 has been tested and found to comply with the li

Seite 24

The cable included in the SYNC/570i-56 EIA-232 package has a DB-25 male connector on the board end, and a DB-25male connector on the peripheral end. T

Seite 25

The cable included in the SYNC/570i-56 V.35 package has a DB-25 male connector on the board end, and a V.35 maleconnector on the peripheral end. The p

Seite 26

WARNINGMake sure your computer is turned off before installing or removing boards. When installing or removing boards, always useadequate precautions

Seite 27

Improper GroundingMake sure that every component in your system is properly grounded. Differences in ground potential between yourcomputer and termina

Seite 28

If You Must Return a BoardSometimes our boards do have problems and have to be returned for service. In this case, you’ll need to call us for an RMAnu

Seite 30

Electrical Surge and Power ProtectionLightning, electrical surges, and power fluctuations can damage your equipment and/or data through the power line

Seite 31

Make sure that you are working in a static-controlled area which includes at least a conductive benchtop mat or chair matthat is electrically connecte

Seite 33

The following configurations are controlled by AT commands:Mode : Switched / LeasedRate: 56K / 64K Clear ChannelLoopbacks: Local LoopbackRemote Termin

Seite 34

Declaration of Conformity(in accordance with FCC Dockets 96-208 and 95-19)Manufacturer’s Name: Digi InternationalCorporate Headquarters: 11001 Bre

Seite 35

&T3 Remote Terminal (RT) S16&T4 * Enable Remote Loopback (RL) S23&T5 Disable Remote Loopback (RL) S23&T6 Remote Loopback S16&T7 Re

Seite 36

&D DTR controlThis command configures the DTR options.&D or &D0 DTR off: command mode; DTR on: data mode. Answer incoming switched call if

Seite 37

&T7 Initiates RL/TP -Remote Loopback with a DSU/CSU generated 511 test pattern. At the end of thetest an error count is returned to the DTE follow

Seite 38

S0 Auto answer Read/WriteS14 Bit mapped Read onlyS16 Bit mapped Read onlyS21 Bit mapped Read onlyS23 Bit mapped Read onlyS27 Bit mapped Read onlyRegis

Seite 39

Register S16, continued4 RL 0-test disabled &T61-test enabled5 RL/TP 0-test disabled &T71-test enabled6 LL/TP 0-test disabled &T81-test en

Seite 40

S23 register - Bit mapped registerBit Function Value Related command0 RL enable/disable 0-RL disabled &T51-RL enabled &T41 Loss of Rx S

Seite 42

These are the messages that the CSU/DSU sends to the DTE in response to an AT command. Whether a numeric responseor a word response is sent is determi

Seite 44 - Register S16, continued

Use the AT commands to send test patterns through loopback paths in order to test the operation of network components.The TM LED is on during a locall

Seite 45 - S27 register, continued

50000563-0150000564-01Tested To ComplyWith FCC Standards FOR HOME OR OFFICE USE

Seite 46

Local Loopback (LL)Data received from the network passes through the line receiver and loops back through the line driver to the network. TheLL is bil

Seite 47

Remote Loopback (RL)Upon receiving a RL signal from the local CSU/DSU, the remote CSU/DSU enters RT configuration. The local DTE canthen transmit data

Seite 49

address/interrupt conflicts, 25ADF files, 13, 14AT commands, 11, 33, 43, 45AT responses, 43baud rate (inconsistent), 25cables 3, 21, 22, 23, 30connect

Seite 51 - Remote Loopback (RL)

FCC Part 68 RequirementsThis equipment complies with Part 68 of the FCC rules. The FCC registration number for this equipment is located on the PC car

Seite 52

CanadaThis equipment complies with part CS03 of the Canadian Department of Communication rules. Digi’s SYNC/570i-56 connects directlyto off-premise Co

Seite 53

1. Introduction....... 1CSU/DSU Features...

Seite 54

1. Switched 56K - Leased Line CSU/DSU daughterboard.......92. Jumper positions for V.35 and EIA-232.........

Kommentare zu diesen Handbüchern

Keine Kommentare